The Spring Lake remodel is staying on track. The HVAC rough in was done today, the plumbing rough in is done, and the electrical rough in should be done tomorrow. From there we have to relocate two windows and then we're ready to hang drywall. Tomorrow we will be heading to Norton Shores to install some tile in a bathroom while we're waiting for the electrical.