Thursday, April 28, 2011

Thursday

We were back out in Blue Lake today. We got a start on the decorative moulding for the kitchen and got the electrical wrapped up. This new kitchen has six can lights, a ceiling fan, lighting below and above the cabinets, a small chandelier above the sink, three pendant lights above the snack bar, and puck lights in two cabinets. Needless to say, its pretty well lit! We also installed more tile and grouted more of what we put in last week. Tomorrow we will have a crew back on the Riverwood Dr. roof to try and finish up that one now that we should finally have a dry day. I will be in Blue Lake solo installing the rest of the decorative trim in the kitchen.

Wednesday, April 27, 2011

Wednesday

We were back in Blue Lake today working on the new kitchen again. We got about 90 % of the new lighting up and running today. We also got the new over the range microwave and refidgerator installed. This kitchen has anti slam hardware on all of the cabinet doors, so we installed all of those as well as the handles. Tomorrow its on to the decorative crown moulding and more tile.

Tuesday, April 26, 2011

Tuesday

We were in Spring Lake today. We  got the custom tile shower grouted and the rest of trim installed. Now that the coutertops are installed we were able to get the last two cabinets installed and the rest of the crown moulding up. We also installed a custom valance and soffit with lights in it. We will need one more trip to put the new doors and hardware back in the frames. we've been waiting for them to get painted.
What a difference from the old kitchen!

Monday, April 25, 2011

Monday

We were out in Blue Lake Today installing the rest of the kitchen cabinets. All of the new cabinets are in but there is a ton of bells and whistles yet to be installed. The doors and draweres all have anti-slam devices that we had to put on. The top of them have a three tiered crown moulding that we have yet to put up, but it is starting to come together. Tomorrow we're back in Spring Lake to try and wrap that one up. We have to grout the tile shower, install two more cabinets now that the coutertops are in, and finish up a few peices of trim.

Thursday, April 21, 2011

Thursday

We had a good day today with our spilt crews. The roofing crew put in a  long day at the Riverwood Rd. house. They got about a third of the roof tore off and shingled back up. The rest of us were out in Blue Lake again grouting the new tile in the kitchen. The painters were right on schedule and got the new drywall in the kitchen and dining room all painted today. Tomorrow the roofing crew will be back on Riverwood, Provided the weather cooperates, and the others back to Blue Lake to start installing the new kitchen cabinets.

Wednesday, April 20, 2011

Wednesday

We were back out in Spring Lake today installing the tilw for the custom tile shower enclosure. We also got the rest of the trim installed today. The coutertops will be getting installed on Monday and then we can finish this one up. Tomorrow we are going be having two crews going. One will be going to a house on Riverwood Dr. to start a roof. This is a house that we installed new siding on last fall. the rest of us will be in Blue Lake to grout the tile we've been installing there. The painters were in today. We should be able to start installing the new kitchen cabinets on Friday.

Tuesday, April 19, 2011

Tuesday

We were back out in Blue Lake today installing tile. We've got about 85% of it installed now, some of it has inlayed decorative designs in it. Its looking pretty sharp. By Friday we should be ready to start installing some of the new kitchen cabinets. Tomorrow we will be in Spring Lake installing the tile for the custom shower and putting up the rest of the trim. Almost there on that one!

Monday, April 18, 2011

Monday

We were back out in Blue Lake today. We had couple guys removing some siding and replacing some severely water damaged wood that we discovered while removing and replacing the roof. The drywall for the new kitchen should be sanded out and ready for paint tomorrow. We also got about half of the new tile flooring in place. We are doing some decorative in-layed designes and it turn out real sharp! We'll be back there tomorrow to keep the tile moving along.
The rest of the tlie for the Spring Lake project is supposed to arrive tomorrow. We will be there on Wednesday to install that and the rest of the trim.

Thursday, April 14, 2011

Thursday

We finally got thing wrapped up at Northway Bowling Lanes today! They now have a nice covered smoking area outside of the main entrance. From there we headed to Spring Lake to install some more of the trim. We will be back there in the morning to finish the trim, install the bathroom cabinets and tile in the shower floor. We're almost there on this one too.

Wednesday, April 13, 2011

Wednesday

We were at Northway Lanes today finishing up the outdoor smoking area. We just about got it done but have to go back tomorrow morning to finish up some of the trim work and touch up painting. We should be a couple hours in the morning and then on to Spring Lake to install the trim for the remodel there. The drywall finishers will get going on the Blue Lake kitchen remodel mid morning tomorrow as well.

Tuesday, April 12, 2011

Tuesday

We got the new kitchen area for the Blue Lake remodel drywalled today! The finishers will be in Thursday to start finishing. From there we can paint and start on installing the new cabinets and flooring. Tomorrow we will finally be wrapping up the smoking room at Northway Lanes. Its been frustrating waiting this long for the parts to come in to finish up! We will also be heading out to Spring Lake to install some trim to try and get that one finishe up as well!

Monday, April 11, 2011

Monday

I went to Spring Lake this morning to install some pocket doors, extention jambs, and trim for the remodel project that we have going on. This one is getting real close to the final stages now! We had other work going on in Blue Lake, while we were doing the roof we found a few areas with some major rot issues that needed to be addressed. The kitchen is ready for drywall in Blue Lake also. We'll be installing that tomorrow.

Thursday, April 7, 2011

Thursday

We had the whole crew back out in Blue Lake again today. We just about got the roof portion completed. One more dry day should do it for that. We have been working on getting the new kitchen ready for the new drywall. Lots of new wiring and plumbing needed to be done. We should be able to wrap that up as well with a good day tomorrow.

Wednesday, April 6, 2011

Wednesday

We were all back out in Blue Lake today. We had a couple guys working on the roof still when it wasn't raining. We should be able to get the roof wrapped up with two more dry days. Sam and myself were working on roughing in for the new kitchen. We had to relocate a window over the kitchen sink and we finished putting in the header in place of a wall to open up the kitchen to the dining room. We also has some of the new plumbing and electrical being roughed in.

Tuesday, April 5, 2011

Tuesday

We were all out at the Blue Lake project today. We had two guys working on the roof which is nearing the finishing stages. Meanwhile, we finished the demo for the new kitchen. We tore out a wall and replaced it with a beam to open up the kitchen to the dining room. Tomorrow we will be installing the new plumbing and electrical.

Monday, April 4, 2011

Monday

It was definately a Monday today! We had two guys in Blue Lake demoing a kitchen for the big remodel there. We are just about done with the roof there but the wether didn't cooperate for that part of it. I was in Spring Lake for the day installing the rest of the cabinets and most of the trim and finish work. We are nearing the finishing stages of this one. We are also still waiting for the rest of the materials for the smoking area at Northway Lanes. It'll be nice to get some of these completed!