Tuesday, August 30, 2011

Tuesday

Still plugging away at the steel roof install in North Muskegon. Its been a slow process due to the age of the house. We are also installing new aluminum eaves so there had been a lot of prep work that has been needed. We are going to do our best to maintain the architectural features of the house. We are also going to be installing a pitched roof over a flat roof portion on the back of the house. There is another section where we are building some new walls for a future addition. Lots of work to be done yet!

Monday, August 29, 2011

Monday

We started a steel roof install in North Muskegon today. We're putting a standing seam, hidden fastener roof system on. The back of the house has a flat roof across the entire back. We will be constructing new rafters for a pitched roof. To this point we have most of the shingles torn off and dryed in. We installed the new steel on the front side of the main house portion.

Thursday, August 25, 2011

Thursday

The exterior of the Norton Shores remodel was completed today, with the exception of the stone on the garage and the new garage door. Those two items should arrive in about two weeks. We also gutted the new master bathroom area down to the studs today.
Tomorrow we will have one crew back at the Norton Shores remodel to install some new tile. Another crew will be starting a steel roof install in North Muskegon.

Wednesday, August 24, 2011

Wednesday

The Addition that we've been working on Norton Shores was finally completed today! The final inspections are being done tomorrow. The other remodel that we started in Norton Shores is coming right along as well. The new siding on the front of the house will be done tomorrow with the exception of some stone. We will be starting to demo the master bathroom for a complete remodel tomorrow too!

Tuesday, August 23, 2011

Tuesday

We kept plugging away at the remodel in Norton Shores today and it is coming along good so far. We put a new roof on this past weekend. We are also giving the front side of the house a face lift by installing new siding and some stone. We are trimming out all of the front windows in composite trim as well as install new aluminum eaves on the entire house. The interior will be getting some new ceramic tile and the master bathroom will be gutted, enlarged, and completely redone.
The other addition in Norton Shores will be finaled out the week too!

Monday, August 22, 2011

Monday

We started another major remodel project in Norton Shores. We finished up the pole barn on Walker Rd. last Friday and it was inspected and approved today. We also have a steel roof that we will be starting in North Muskegon real soon.

Thursday, August 18, 2011

Thursday...Already?

Boy it's been a busy week! We will be finishing up the 28' x 40' pole barn on Walker Rd. tomorrow. Once we got started on this one things went very smooth. We started last Wednesday and will have it completed this Friday. Not too bad considering we waited two months to build it! The customer couldn't be happier with the quick turn around, so thats a good thing.
We will be in North Muskegon rebuilding part of a roof and installing new standing seam steel roofing on the entire roof. We will also be starting a extensive remodel in Norton Shores.

Monday, August 15, 2011

Monday

We are making excellent progress on the 28' x 40' pole barn on Walker Rd. It is all framed up and the roof is almost done. We preped for concrete today and will be pouring the floor first thing in the morning.
We also had a crew putting a new roof on a house in Blufton this past weekend.

Wednesday, August 10, 2011

Wednesday

We started a 28' x 40' pole barn on Walker Rd. in Muskegon Township today. We've been waiting over two months to to obtain the permit for this one so it feels good to get started. The customer thinks so too! We got a good start today, all of the holes were drilled, inspected, and the poles were set. Tomorrow the walls go up.
The plumbing was also wrapped up today at the Norton Shores remodel with the exception up the vanity which came in damaged. The new one should be here any day now to completely finalize the project.

Monday, August 8, 2011

Monday

We finished the porch remodel in North Muskegon today. We also got approved to build a 28' x 40' pole barn on Walker Rd. today. We will begin the build for that on Wednesday. We also have a standing seam steel roof coming up real soon in North Muskegon.

Tuesday, August 2, 2011

Tuesday

The Norton Shores addition is just about wrapped up! We installed the last few pieces of trim today and we also installed the glass shower door for the custom tile shower. The new fixtures are all in place. The electrical was all finalized today as well with the plumbing soon to follow.
The drywall is very close to being finished at the North Muskegon porch remodel, its taking forever for it to dry with all of this humidity. It should be ready for paint tomorrow.

Monday, August 1, 2011

Monday

We installed the rest of the trim at the Norton Shores addition today! Tomorrow the eletrical will be getting finished up with the plumbing soon to follow. This one is so close to being complete, the only thing that will hold us up is the custom vanity top for the new bathroom came in damaged. It will be about five days before the new one arrives.
The drywall is almost finished and ready for paint at the North Muskegon porch remodel. We should be painting and finishing that one up too by weeks end.