Wednesday, September 28, 2011

Wednesday

We finished up the remodel project in Norton Shores today! The new garage door was installed and the last of the finishing details were also completed. Photos of this one and the Steel roof in North Muskegon will be posted on the website real soon.

Monday, September 26, 2011

Monday

We finished up the steel roof install in North Muskegon today! The rain held off long enough for us to get the rest of the siding installed on the new upper addition. Turn out real nice. We will also finish up the Norton Shores remodel tomorrow. All thats left is installing the new garage door.

Tuesday, September 20, 2011

Tuesday

The North Muskegon steel rood install is so close now. We will finish up the framing for the addition section tomorrow. The last of the steel trim should be wrapped up by Thursday.
We also got the new tile floor installed in the master bathroom remodel in Norton Shores. The grout will be going in tomorrow. Form there its install the new vanity, sink, toilet, and light fixtures.

Monday, September 19, 2011

Monday

We had intentions of finishing up the steel roof in North Muskegon today but were rained out. Instead we installed the tile shower enclosure at the Norton Shores remodel. We will have a crew back there tomorrow to install the new tile floor. WE should have that finished up by the end of the week as well.

Thursday, September 15, 2011

Thursday

One more step closer to completion on the steel roof install in North Muskegon. We should have it pretty well wrapped up tomorrow with the exception of the new siding on the addition on the back.
The drywall got its second coat of mud over at the Norton Shores master bath remodel.

Wednesday, September 14, 2011

Wednesday

Our steel roof install in North Muskegon is getting real close to being finished. All of the steel is finished except for one custom piece which will be in tomorrow. We also had to custom bend most of the fascia because it is a stepped look which gives it some added dimension. The customer also chose to have us install a 5" dental molding for another architectural feature. Its coming together real nice!
The interior master bath remodel in Norton Shores is going well too. The dry wall was hung and first coated today and should be finished by Friday. As soon as that is done we can install the tile shower enclosure around the new whirlpool tub and the floor.

Monday, September 12, 2011

Monday

The steel roof in North Muskegon is just about finished. All of the steel is on the roof and we started installing the new aluminum eaves today. We also had to demo an old bathroom to open up an area that we added on the upper level.
Our remodel in Norton Shores is getting there too. The new master bathroom is ready for drywall. The plumbing and electrical was finished up today. Once the drywall is up we can install the new tile floor and tile shower enclosure.

Thursday, September 8, 2011

Thursday

The steel roof install is getting closer to the final stages. We will have the rest of the metal installed tomorrow as well as the trim. Then, we just have to install the new eaves and some decorative trim to give it some architectural appeal. We put some new walls up to expand an upper bathroom as well.
We've also been plugging away on the interior of the Norton Shores remodel.

Tuesday, September 6, 2011

Tuesday

Hope everyone had a good holiday weekend! After the small break, we were back in North Muskegon still going on the Steel roof install. We built all of the new rafters to pitch some flat roof sections last week. Today we got all of the steel installed. Now we just need to get the trim and the new eaves installed.
Also installing the new plumbing for the Norton Shores remodel tomorrow.