Thursday, July 28, 2011

Thursday

The drywall was installed today at the porch remodel in North Muskegon. The first finish coat will be going on tomorrow. We also installed the doors and most of the trim at the Norton Shores addition. This one is real close to being complete!

Wednesday, July 27, 2011

Wednesday

Installed all of the insulation today in for the porch remodel in North Muskegon today. We also relocated a heat run to heat the new room. Tomorrow we be hanging the drywall and getting ready for the finishing stages. We still have a few more things to wrap up on the exterior but the weather didn't cooperate. We also had the new doors and trim delivered to the Norton Shores addition. We will have a crew installing that as well tomorrow.

Tuesday, July 26, 2011

Tuesday

We just about finished up the framing and the exterior for the proch remodel in North Muskegon today. Tommorrow we will be insulating the interior and getting ready to hang the drywall. We will also be heading back to Norton Shores to do the rest of the finish work for the addition. We will be installing the doors, trim and vanity.

Monday, July 25, 2011

Monday

We started a small remodel in North Muskegon today. We are converting a porch/three seasons room into a bedroom. Its already a little more involved than originally thought due to some rot. Thats all part of remodeling thought, we'll fix it up and put it back together. We will also be wrapping things up at the Norton Shores addition this week as well.

Thursday, July 21, 2011

Thursday

We finished up the retaining wall in Holton today!

Wednesday, July 20, 2011

Wednesday

We were back out in Stoney lake today and just about finished up the 10'x10' shed we are building. It will be all wrapped up tomorrow morning. We will also be in Holton finishing up a retaining wall along side of a garage we built last winter.

Tuesday, July 19, 2011

Tuesday

The tile is almost complete at the Norton Shores addition. The shower walls are looking great and with just a few more square feet to install the grout will be going in next and the homeowners are going to begin painting tomorrow. Once the paint is on we just have to install the new fixtures and trim and it will be complete. Meanwhile we were up in Stoney Lake building a 10' x 10' shed with a roll up door.

Thursday, July 14, 2011

Thursday

We finished up the siding roofing on the shed today. The drywall is also finally dry and finished up at the Norton Shores addition. We also were there today and poured the floor pan for the custom tile shower and installed in floor heat for the new ceramic tile floor. The tile is ready to go in after the paint is on the walls this weekend. We're at the home stretch on this now!

Wednesday, July 13, 2011

Wednesday

The drywall was not quite ready at the Norton Shores addition. With all of this humidity lately, the final coat of mud didn't quite dry enough today to do a final sanding. It should be good to go tomorrow morning. We will also be finishing up the prep work for the new ceramic tile. The new bathroom floor will have in floor heat! Meanwhile we put a new roof and siding on a shed at a house that we sided last fall and roofed this past spring.

Tuesday, July 12, 2011

Tuesday

The drywall is finished at the Norton Shores addition. The homeowners will be painting tomorrow. From there we can come in and install the tile floor and shower. Meanwhile, we've been at the North Peir Condominiums in North Muskegon making some repairs. Tomorrow we will be siding a shed at a house the we installed new siding on last fall.

Monday, July 11, 2011

Monday

The drywall at the Norton Shores addition is almost complete! It should be done tomorrow and the homeowners will be painting on Wednesday. From there we have to install the tile and the new fixtures and this one will be complete. While the drywall has been going on, we've been taking care of some door installs and some smaller projects.

Wednesday, July 6, 2011

Wednesday

The exterior of the Norton Shores addition is 100% now. Looks like a totally differenr house! The drywall started going up yesterday and was about 90% hung at the end of today. Tomorrow we will be installing the subfloor for the tile floor and the backer board and shower pan for the custom tile shower.
The interior should be about wrapped up by the end of next week.