Monday, April 30, 2012

Monday, April 30th

Today we installed nine new replacement windows in a home on the East end of Muskegon. Two of the openings had to be built small and we installed some new siding on the front. Next we will be heading to Grand Haven to begin a pretty sizable remodel. To start we will be installing a new roof, it will not be a normal roof install however. First we are building the roof up with 1 1/2" foam insulation board and installing new decking over that. This house is a historical home in the downtown area so it is very old with little insulation. We will also be installing new windows and remodeling the interior after the roof.

Wednesday, April 25, 2012

Wednesday, April, 25th

We have been working all this week on the roof project in East Muskegon. We have removed all of the old shingles and installed the new ones. We should be finished up with it tomorrow. We do have to remove the old roofing from a flat section that will quite possibly have to be rebuilt before we install the new low slope roofing. We also finished up the 7'x10' shed in Norton Shores. We will have photos up soon!

Wednesday, April 18, 2012

Wednesday, April 18th

We finished up the deck project on Bear Lake in North Muskegon today! Turned out pretty sharp. Tomorrow we will be finishing up the 7'x10' shed in Norton Shores. We are also starting a roof job on the East end of town, if the weather hold off. We may end up doing this one in small sections if the forecast is anything like they say.

Monday, April 16, 2012

Monday, April 16th

Our deck project on Bear Lake in North Muskegon is coming along nicely. We should have the decking portion of it finished up tomorrow. We are quoting out installing a stainless steel cable rail system for the deck as well. We also got the concrete pad poured for a 7'x10' shed in Norton Shores. We will have another crew working on framing that up tomorrow. After these two are complete we have a couple of roofs to tackle.

Tuesday, April 10, 2012

Tuesday, April 10th

We finished up the 30'x40' pole barn in Fennville today! Got the attic insulation blown in and the interior lights installed. Tomorrow we will be starting a 12'x42' deck in North Muskegon on Bear Lake. It will have radiused corners and the side will be flared out on 45 degree angles. It may possibly also have stainless steel cable rail system as well. We will have some photos of the pole barn up soon!~

Monday, April 9, 2012

Monday, April 9th

We are heading back down to Fennville tomorrow one last time for the 30'x40' pole barn project. That's right, we will be finished up tomorrow! we were there today and coated the drywall one last time. We also installed the heater and thermostat and fired that up. Tomorrow we will blow in the attic insulation and install the interior lighting. From there a little clean up and thats a wrap. Next we will be in North Muskegon building a large deck on Bear Lake.

Wednesday, April 4, 2012

Wednesday, April 4th

We started finishing the drywall on the interior of the Fennville pole barn today. We got it all first coated and a partial second coat. Back at it tomorrow to finish the second coat and start smoothing out everything. From there its just installing the heater and gas line and we'll have this one completed!

Tuesday, April 3, 2012

Tuesday, April 4th

We finished installing all of the drywall in the 30'x40' pole barn down in Fennville today. We also got the rest of the electrical wrapped up, we installed the exterior lights and got the outlets and switches in. Tomorrow we will work on the first coat of finishing the drywall.

Monday, April 2, 2012

Monday, April 2nd

We should be done with the pole barn in Fennville this week. The exterior is done and we started the interior today. We roughed in all of the electrical and gas line for the new heater. We also installed the insulation in the walls and hung most of the drywall on the walls. Tomorrow we will hang the drywall on the ceiling and start finishing the drywall. We will also finish up the electrical tomorrow.