We are still waiting to get the electrical rough in inspection so that we can finish up the garage in Holton. The inspection should be getting done tomorrow morning. We were out there today to tie up all of the loose ends that we could before we install the drywall. We will be going back to Crockery Township to continue working on framing the 30 x 32 pole barn. We will have it ready for trusses by mid morning. Then back out to Holton to hopefully hang the drywall. We also cleaned up all our equipment that was outside, bracing for the big snowstorm we're supposed to get. I hope they're wrong!