Wednesday, March 9, 2011

Wednesday

We got rained/snowed out at Northway Lanes today. We headed back up to Twin Lake today to install three new toilets, a faucet, and a utility tub. This was a foreclosure that was a mess and we are getting it back up and running. We will also be building a new deck there. If the weather cooperates, we will be finishing up the block back at the bowling ally tomorrow. The materials for the roof system are also being delivered tomorrow.

Tuesday, March 8, 2011

Tuesday

We installed about 90% of the block half walls for the outdoor smoking area at Northway Bowling Lanes. We have to finish up the last row and install the wall cap. We should be building the roof system for it on Thursday. From there we will be waiting for the steel roofing to come in and then we can finish up! We will also be back on the Spring Lake remodel by the end of the week to begin preping for the ceramic tile.

Monday, March 7, 2011

Monday

We were back at Northway Bowling Lanes today and we got the footings inspected and approved. We got the concrete pad poured and tomorrow we will be installing the block half wall for the outdoor smoking area. Once that is done then we can build the rood system over it.
The drywall finishers are still making progress on the remodel in Spring Lake. We should be back there next week to start installing some of the new tile.

Friday, March 4, 2011

Friday

We headed up to Twin Lake today to install a new tub and tub surround unit. We also put in a couple new faucets. The weather wasn't to nice out so I was a good day to tackle a smaller project of this nature. We should be pouring the concrete for the outdoor smoking area at Northway Bowling Lanes of Monday if the weather forcast stays the same.

Thursday, March 3, 2011

Thursday

We started digging the footings for the outdoor smoking area at Northway Bowling Lanes today. We also got the forms all in and it is ready for concrete. It will be getting inspected on Monday morning and we should be pouring the cement after the inspection if the weather cooperates. The drywall finishers got started today on the Spring Lake remodel project. They should have their part done by mid week next week.

Wednesday, March 2, 2011

Wednesday

The finishers will be starting to finish the drywall at the Spring Lake remodel tomorrow morning. That should be finished by the end of next week. Meanwhile, this afternoon we started the out door smoking area at Northway Lanes. Tomorrow we will be preparing the footings and getting ready to pour the concrete for the project.

Tuesday, March 1, 2011

Tuesday

The new drywall is all hung for the Spring Lake remodel. The guys from LM Homeworkings will be there on Thursday to begin finishing it. Its going to have smooth walls and a "crowsfoot" or "stomp" textured ceiling. We also got started on putting together the floor pan for the custom tile shower enclosure. The walls will be going in there tomorrow too. While we are waiting for the drywall to be finished we will be at Northway Bowling Lanes installing a covered smoking area attahed to the building.