Monday, April 4, 2011

Monday

It was definately a Monday today! We had two guys in Blue Lake demoing a kitchen for the big remodel there. We are just about done with the roof there but the wether didn't cooperate for that part of it. I was in Spring Lake for the day installing the rest of the cabinets and most of the trim and finish work. We are nearing the finishing stages of this one. We are also still waiting for the rest of the materials for the smoking area at Northway Lanes. It'll be nice to get some of these completed!

Thursday, March 31, 2011

Thursday

Once again, We had the roofing crew in Blue Lake plugging away at the roof there. Me and Sam were back in Spring Lake today. The new tile floor in the mudroom and bathroom is installed and grouted. We also got started installing the new kitchen cabinets. We'll be back tomorrow to hopefully get the rest of the kitchen installed! The roof crew will be back at it trying to beat the rain coming.

Wednesday, March 30, 2011

Wednesday

We had one crew back out at The Blue Lake roof job installing some more of the roof. It is a pretty big roof so it taking some time to install. It was in major need of repair. We are having to replace some of the roof decking because the existing eaves are completely rotted out. Myself and Sam headed back to Spring Lake to get the tile flooring installed. We'll be back there tomorrow to grout it and start on installing the new kitchen cabinets. Things are really starting to come together on that one! It won't be long for the finished product!

Tuesday, March 29, 2011

Tuesday

We moved over to Blue Lake Township to start another roof today and made some good process. The weather has been pretty cooperative for roofing! We will have a crew on this one for the rest of the week. Meanwhile, myself and another guy will be heading to Spring Lake to install the tile and cabinets for that project as that one is nearing the end.

Monday, March 28, 2011

Monday

We spent this past weekend roofing! It was time to get a new roof on my own house, overdue actually. The whole crew was over on Friday, Saturday, Sunday, and today. Not only did we put a new roof on, we built the whole roof up with 1 1/2" insulation board and extended the eaves to 16". Why they built houses with no eaves in Michigan is beyond me. We'll be finishingup tomorrow morning and then heading back to Spring Lake to finish up the big remodel.

Wednesday, March 23, 2011

Wednesday

Well, we were supposed to start and roof today in Blue Lake Township but the icing we got last night made it near impossible. Instead we gutted the kitchen at the same house. We are going to be doing a pretty high end and extensive kitchen remodel in this one. It will entail moving a wall and some window and door openings too. The Spring Lake remodel is also coming right along. The second coat of polyurethane is going on the new hardwood floors tonight and the new kitchen cabinets arrived today. We will be installing them as well as the new tile next week.

Tuesday, March 22, 2011

Tuesday

We finished up some odds and ends at Northway Lanes this morning. Wa have a few more loose ends to tie up on the steel roof but the weather was not very cooperative for such a project. We headed up to North Muskegon in the afternoon to install a garage door opener. We'll have to wait and see what the weather does tomorrow! Hopefully this  freezing rain moves out quickly.